Cedar Run Bridges

Cedar Run Bridges

Project Description

For 2 consecutive years we contracted to demolish and replace a total of 4 pedestrian bridges at Cedar Run apartments. We replaced 2 bridges per year at 2.5 months per bridge. The scope of work included demolition of structure, forming and pouring of spans and abutments, installation of pedestrian traffic coatings, installation of flange to flange connector plates and demolish and replace stair supports. Repair cost: $297,400.

Location

Denver, CO

Engineer

The Leffler Group

Services

demolish and replace 4 bridges, replace stair support

View Similar Projects

Denver Corporate Center

Services include: epoxy injection, expansion joint replacement, installation of urethane coating, partial depth concrete patching, structural concrete patching

The Chancery

Services include: partial and full depth concrete patching, post-tension cable repair, rout and seal cracks

Leprino Parking Garage

Services include: concrete repair, waterproofing, caulking, wing wang repair

TESTIMONIALS