Cedar Run Bridges

Cedar Run Bridges

Project Description

For 2 consecutive years we contracted to demolish and replace a total of 4 pedestrian bridges at Cedar Run apartments. We replaced 2 bridges per year at 2.5 months per bridge. The scope of work included demolition of structure, forming and pouring of spans and abutments, installation of pedestrian traffic coatings, installation of flange to flange connector plates and demolish and replace stair supports. Repair cost: $297,400.

Location

Denver, CO

Engineer

The Leffler Group

Services

demolish and replace 4 bridges, replace stair support

View Similar Projects

The Galleria Office Towers

Services include: window to frame sealants, stucco to stucco joints, stucco to window joints

Penn VII Penthouse

Services include: concrete coping replacement, concrete patching, rout and seal cracks, structural concrete patching, concrete column repair.

Cherry Tower

Services included: concrete repair, decorative microtopping, Expansion joint replacement, Installation of epoxy coating, Installation of urethane traffic coating

TESTIMONIALS