Cedar Run Bridges

Cedar Run Columns

Project Description

In accordance with the design and specifications by the Leffler Group, we poured concrete jackets around sixty 8”x 8” concrete columns. The project required us to build concrete jacket forms, drill and install (into epoxy) shear pins, install steel rebar cages, install forms then pour pre-extended repair mortar. When the concrete was cured we grouted the top 1” with 5,000 psi NSNM grout then removed the forms. Repair cost: $90,000.

Location

Denver, CO

Engineer

The Leffler Group

Services

build concrete jacket forms, install rebar cages, pour BASF MasterEmaco S-440

View Similar Projects

Denver Corporate Center

Services include: epoxy injection, expansion joint replacement, installation of urethane coating, partial depth concrete patching, structural concrete patching

Orchard Pointe

Services include: urethane traffic coating, concrete patching, rout and seal cracks, structural steel bracing installation

The Galleria Office Towers

Services include: window to frame sealants, stucco to stucco joints, stucco to window joints

TESTIMONIALS