Cedar Run Bridges

Cedar Run Columns

Project Description

In accordance with the design and specifications by the Leffler Group, we poured concrete jackets around sixty 8”x 8” concrete columns. The project required us to build concrete jacket forms, drill and install (into epoxy) shear pins, install steel rebar cages, install forms then pour pre-extended repair mortar. When the concrete was cured we grouted the top 1” with 5,000 psi NSNM grout then removed the forms. Repair cost: $90,000.

Location

Denver, CO

Engineer

The Leffler Group

Services

build concrete jacket forms, install rebar cages, pour BASF MasterEmaco S-440

View Similar Projects

Root Garage

Services include: rout and seal cracks, remove and replace delaminations, repair tee stems, Replace expansion joint, curb stops, topping slab.

Cedar Run Columns

Services include: build concrete jacket forms, install rebar cages, pour BASF MasterEmaco S-440

University Corporation for Atmospheric Research

Services include: carbon fiber strengthening, post-tension repair

TESTIMONIALS