cherry tower, Denver, CO

Cherry Tower

Project Description

The drive surfaces of this five level parking garage had worn substantially over the years. After repairs to the concrete, we applied a leveling layer of epoxy and sand, and then a four layer vehicular urethane traffic coating system. Included in the garage repairs were expansion joint replacement and flange to flange connector plate installation. In addition, at the building’s main entrance, we performed structural repairs and full removal and replacement of the concrete stairs and landings. Finally, we poured a concrete slab adjoining Cherry Street and installed a decorative micro topping to complement the tile design at the entrance. The work was engineered by Jeff Carlson of Martin/Martin Consulting Engineers. Repair costs: $232,000.

Location

Denver, CO

Engineer

Martin/Martin Consulting Engineers

Services

concrete repair, decorative microtopping, Expansion joint replacement, Installation of epoxy coating, Installation of urethane traffic coating

View Similar Projects

Denver Corporate Center

Services include: epoxy injection, expansion joint replacement, installation of urethane coating, partial depth concrete patching, structural concrete patching

Cedar Run Columns

Services include: build concrete jacket forms, install rebar cages, pour BASF MasterEmaco S-440

Civic Center Plaza

Services include: vault repairs, grate and beam replacement


TESTIMONIALS