Denver Corporate Center

Denver Corporate Center

Project Description

At this three level stand-alone parking structure in the Denver Tech Center, we have performed repairs for the past three years. Repair design is by David Wittman of Martin/Martin Structural Engineers. Repair scope has included replacement of all upper level expansion joints, replacement of all topping slab sealants, partial depth and full depth concrete replacement, installation of pedestrian and vehicular traffic coatings and installation flange to flange connector plates. Repair cost: $333,000.

Location

Denver, CO

Engineer

Martin/Martin Consulting Engineers

Services

Epoxy injection, Expansion joint replacement, Installation of urethane coating, Partial depth concrete patching, Structural concrete patching

View Similar Projects

Denver Corporate Center

Services include: epoxy injection, expansion joint replacement, installation of urethane coating, partial depth concrete patching, structural concrete patching

Penn VII Penthouse

Services include: concrete coping replacement, concrete patching, rout and seal cracks, structural concrete patching, concrete column repair.

727 Pearl Street

Services included: cathodic protection, concrete repair, Installation of urethane traffic coating

TESTIMONIALS