Denver International Airport

Project Description

This project was in both airport terminal parking garages, and included installing a thin cementitious micro topping in a newly formed drive lane. The critical nature of this topping installation is accommodating hundreds of vehicles each day without damage or deterioration. Engineering was provided by DIA staff. Repair cost: $24,000.

Location

Denver, CO

Engineer

Denver International Airport

Services

installation of high performance overlay, installation of urethane sealant

View Similar Projects

University Corporation for Atmospheric Research

Services include: carbon fiber strengthening, post-tension repair

The Galleria Office Towers

Services include: window to frame sealants, stucco to stucco joints, stucco to window joints

Orchard Pointe

Services include: urethane traffic coating, concrete patching, rout and seal cracks, structural steel bracing installation

TESTIMONIALS